Cool1

Manifold drain pipe repair – Cool Boreas LNG Tanker

Client

Cool Management Oslo

When

February 26

Duration

28 days

Services

Manifold drain pipe repair – Cool Boreas LNG Tanker

Vessel: Cool Boreas LNG Tanker/Voyage: Hawaii – Korea (28 days)

Scope of work

During the voyage, leaks were identified on two small manifold drain pipes – one on the port side and one on the starboard side cargo manifold. StS-ISONOR was contacted on short notice to assess and carry out the repair.

Mobilisation

Equipment was dispatched from Norway on Friday morning and shipped to Hawaii. StS-ISONOR engaged a trusted partner for welding and NDT services, including vessel and rig support. Personnel were mobilised to Honolulu with a two-day margin before the LNG tanker was scheduled to pick up equipment and crew offshore.

Cool1 frame
Manifold drain pipe repair – Cool Boreas LNG Tanker

Due to vessel delays, personnel had to remain in Hawaii for five days before mobilisation could proceed.

Execution

The operation was successfully executed under challenging logistical conditions, demonstrating StS-ISONOR’s capability to respond quickly, mobilise globally, and deliver safe, high-quality solutions – even during ocean passage.