Singappor adriaterhavet

Habitat repair operation – BW SINGAPORE, Adriatic Sea

Client

BW SINGAPORE

When

February 26

Duration

1 week

Services

Vessel

Floating Storage/Production Unit BW SINGAPORE

Scope of work

StS-ISONOR carried out repair work inside one of the vaporizers located on the forward main deck. The scope included grinding of damage to a cooler, using both a grinder and a drill. As the work could generate sparks, it was required that the operation was performed either gas free or inside a closed habitat.

Habitat bilde Adriaterhavet. Feb 26
Habitat repair operation – BW SINGAPORE, Adriatic Sea

Solution

A custom-built habitat was installed to contain sparks and heat within the work area, ensuring safe execution without impact on surrounding equipment.

Result

The work was completed safely and efficiently with excellent results. A demanding task was solved in a professional manner, resulting in a highly successful operation.